

| Parameter | Nilai |
|---|---|
| 85 V AC (“1” signal) | |
| Nota | Confirmation: floating change-over contact, signal contact |
| Kedalaman | 114.5 mm |
| Lebar | 22.5 mm |
| Ketinggian | 99 mm |
| Tork | 0.5 Nm ... 0.6 Nm |
| Petunjuk | Red LED |
| Nama input | Device supply |
| Penamaan | Standards/regulations |
| Jenis kenalan | 1 PDT |
| Benang skru | M3 |
| Mod operasi | 100% operating factor |
| Paparan status | Yellow LED |
| Nama sambungan | Control circuits |
| Arus kebocoran | 0 mA |
| Tahap pertukaran | < 5 V AC (For EMERGENCY STOP) |
| Panjang pelucutan | 8 mm |
| Kaedah sambungan | Screw connection |
| Kedudukan pemasangan | vertical (horizontal DIN rail, motor output below) |
| Julat arus beban | 180 mA ... 2.4 A (see to derating) |
| Litar pelindung | Surge protection |
| Frekuensi penukaran | ≤ 2 Hz (Load-dependent) |
| Ambang pertukaran | 44 V AC (“0” signal) |
| Tahap perlindungan | IP20 |
| Arahan pemasangan | alignable, for spacing see derating |
| Piawaian/peraturan | IEC 60947-1 |
| Waktu rehat biasa | < 70 ms |
| Julat voltan operasi | 42 V AC ... 550 V AC |
| Paparan voltan operasi | Green LED |
| Arus penggerak yang dinilai IC | 7 mA |
| Voltan penggerak yang dinilai UC | 230 V AC |
| Voltan operasi dinilai Ue | 500 V AC |
| Keratan rentas konduktor AWG | 24 ... 14 |
| Kategori mengikut EN ISO 13849 | 3 (Safe shutdown) |
| Pepejal keratan rentas konduktor | 0.2 mm² ... 2.5 mm² |
| Suhu ambien (operasi) | -25 °C ... 70 °C (observe derating) |
| Arus bekalan kawalan dinilai IS | 4 mA |
| Keratan rentas konduktor fleksibel | 0.2 mm² ... 2.5 mm² |
| Arus operasi dinilai pada AC-51 | 2.4 A |
| Arus operasi dinilai pada AC-53a | 2.4 A |
| Suhu ambien (penyimpanan/pengangkutan) | -40 °C ... 80 °C |
| Voltan bekalan litar kawalan dinilai AS | 230 V AC (50/60 Hz) |
| Tahap prestasi mengikut ISO 13849 | e (Safe shutdown) |
| Tahap Integriti Keselamatan mengikut IEC 61508 | SIL 3 (safe shutdown) |
| Ciri pencetus dalam akaun dengan IEC 60947 | Class 10A |
Spesifikasi teknikal dan data prestasi
Panduan pemasangan dan operasi